In drill pipe procurement, the MTC (Mill Test Certificate) is one of the most critical quality documents. It serves as both the “birth certificate” and the “identity card” for the drill pipe, documenting its complete quality history from molten steel to finished product. Understanding the MTC is a crucial step in ensuring that you procure compliant drill pipes.

I. What is MTC? 

MTC (Mill Test Certificate), also known as a factory test report or material certificate, is a quality‑assurance document issued by the steel pipe manufacturer. It records the chemical composition, mechanical properties, and heat‑treatment condition of a particular heat of molten steel.

The core value of MTC lies in its traceability: each drill pipe is stamped with a Heat Number, which corresponds one-to-one to the Heat Number on the MTC. By referencing this Heat Number, you can trace a specific drill pipe on site back to its original factory‑issued test report, and further back to the particular heat of molten steel from which it was produced.

MTC is sometimes also referred to as MTR (Mill Test Report) or CMTR (Certified Mill Test Report). In drill pipe procurement, MTC and MTR typically refer to the same document.

II. What’s in the MTC? — An Item-by-Item Breakdown 

A complete drill pipe MTC typically comprises the following eight core components:

1. File Header Information

FieldExplanation
Steel mill name and addressWho issued this certificate?
Certificate NumberUnique Identification Number
Date of IssueCertificate Issue Date
Customer Name and Order NumberCorresponding to your purchase order

2. Product Description

Including product type (drill pipe/weighted drill pipe/drill collar), outer diameter (OD), wall thickness (WT), length, steel grade (e.g., G105/S135), and applicable standards (e.g., API 5DP ) and quantity. This section must be identical to your purchase order.

3. Heat Number — The Most Important Column

The heat number serves as the “key” that links the MTC document to the physical drill pipe. The heat number on the MTC must exactly match the heat number stamped or spray‑marked on the drill pipe body. If they do not correspond, the MTC is essentially worthless—it certifies “someone else’s steel, not your steel.”

4. Chemical Composition

List the measured contents of each element in the molten steel, including:

C (carbon), Mn (manganese), Si (silicon), P (phosphorus), S (sulfur) — the five major alloying elements.

Cr (chromium), Mo (molybdenum), Ni (nickel) — alloying elements (the higher their content, the greater the strength)

During procurement, these measured values shall be compared with the limit values specified in API 5DP.

5. Mechanical Properties

This is the key data for determining whether the drill pipe’s strength meets the required standard:

IndicatorMeaningThe significance of drill rods
Yield Strength (YS)The stress value at which steel begins to undergo permanent deformation.Determine the tensile and torsional load capacities of the drill pipe.
Ultimate Tensile Strength (UTS)The maximum stress that steel can withstand before fracture.Determining the ultimate bearing capacity of drill rods
ElongationPlastic strain prior to fractureReflects the toughness of the drill pipe—too low elongation can lead to brittle fracture.
HardnessResistance to indentationExcessive hardness may indicate increased brittleness.

6. Dimensional Inspection

Record the actual measured values of outer diameter, wall thickness, length, ovality, straightness, and other parameters.

7. Nondestructive Testing Results (NDT Results)

Record the results of ultrasonic testing (UT), magnetic particle testing (MT), and other inspection methods.

8. Authorized Signature

Signature, seal, and date of the head of the Quality Department.

III. How can the authenticity and validity of an MTC be verified? 

Upon receiving the MTC, it is recommended to perform a system check according to the following steps:

Step 1: Confirm the MTC type.

The EN 10204 standard defines four types of documents:

TypeExplanationApplicable Scenarios
 2.1Declaration of Conformity, no independent test dataNon-Critical Commercial Supply
2.2Test Report Based on Speaker-Independent VerificationGeneral industrial use
 3.1Certification of inspection based on the actual heat, issued by the manufacturer’s quality assurance department.Key industries such as oil and natural gas
3.2 Certificate of inspection, verified by an independent third party (such as SGS, BV, or TÜV)Critical services such as maritime and nuclear industries

For drill pipe procurement, an MTC of at least EN 10204 3.1 or higher should be required. If a 2.1 or 2.2 certificate is received, it indicates that the certificate does not include actual test data; the supplier should be requested to resubmit a valid certificate.

Step 2: Verify Basic Information

Compare the customer name, order number, product specifications, steel grade, and quantity on the MTC with those on the purchase order one by one. Any discrepancies may indicate that this certificate was not issued for your order.

Step 3: Verify the furnace number—the most critical step.

This is the most critical step in the entire verification process. The heat number on the MTC must match the steel stamp or spray‑on marking on the actual drill pipe. If the heat numbers do not align, it indicates that the certificate and the product are not from the same steel batch, rendering the MTC invalid.

Step 4: Check the chemical composition

Compare the measured values of each parameter on the MTC with the limit values specified in API 5DP. Special attention:

Are the contents of each element within the permissible limits specified by the standard?

Are there any instances where the values exceed the maximum limit or fall below the minimum limit?

Step 5: Check the mechanical properties.

The measured yield strength, tensile strength, and elongation are compared with… API 5DP Standard Conduct a comparison. Note:

Does the yield strength meet the minimum requirement for this steel grade?

Certain steel grades (such as sour‑service grades) also have upper limits—higher is not always better.

Step 6: Inspect the nondestructive testing results.

Confirm that the ultrasonic testing (UT) and magnetic particle testing (MT) results have been recorded in the MTC. For higher PSL grades (PSL‑2, PSL‑3), additional verification of data such as the Charpy V‑notch impact test (CVN) is also required.

IV. Frequently Asked Questions (FAQ) 

Q1: Are MTC and the “Certificate of Conformity” the same thing?

No. The MTC includes detailed test data, such as actual chemical composition analysis and mechanical property measurements, whereas a certificate of conformity is merely a statement asserting that “the product complies with the standard,” without providing specific data. When procuring drill pipes, it is essential to require an MTC rather than relying solely on a certificate of conformity.

Q2: What is the PSL rating, and how does it affect MTC?

API 5DP classifies drill pipe into three grades: PSL‑1, PSL‑2, and PSL‑3.

PSL-1: Basic requirements; the MTC shall include basic chemical and mechanical data.

PSL-2: Addition of Charpy impact testing (CVN) and nondestructive examination requirements.

PSL-3: The most stringent, with additional detailed dimensional and process control data.

When placing an order, the PSL grade must be clearly specified.

Q3: How can you identify a counterfeit MTC?

The following situations warrant close attention:

The data is overly tidy (e.g., all values are integers or precisely aligned with the standard line).

Missing furnace number or furnace number is unclear.

No laboratory accreditation seal.

The mechanical property values from multiple MTC tests are completely identical (it is impossible to obtain exactly the same results for molten steel from different heats).

Q4: Is the MTC provided for each drill pipe?

No. The MTC is issued on a per‑heat basis. A single heat of molten steel may weigh several tens of tons and be rolled into hundreds of drill pipes, all of which share the same MTC. Therefore, the heat number is essential for traceability of each individual pipe.

Q5: What role do third-party testing agencies play in the MTC process?

For critical projects, an EN 10204 Grade 3.2 MTC may be required—this means that a third-party inspection agency (such as SGS, BV, or TÜV) not only inspects the product but also signs and certifies the MTC.

V. Summary: MTC Verification Checklist 

Check itemKey points
MTC typeAt least EN 10204 3.1; for critical items, 3.2 is required.
Basic InformationCustomer name, order number, specification, and steel grade are consistent with the PO.
Heat number matchingMTC heat number = Physical steel stamping or spray‑painted heat number on the drill pipe
Chemical compositionThe content of each element is within the limit values specified in the API 5DP standard.
Mechanical propertiesYield strength, tensile strength, and elongation meet the specified requirements.
Nondestructive testingUT and MT inspection results are qualified and have been recorded.
Authorized SignatureWith the signature and official seal of the steel mill’s quality assurance department.
Beware of forgery.Be cautious if the data is overly neat, consistent across multiple copies, and lacks official seals.

A complete MTC serves as both an “identity card” and a “guarantee” for drill pipe quality. Mastering how to interpret an MTC not only enables you to make more informed purchasing decisions but also gives you greater confidence when communicating with suppliers.

Need more information on drill pipe quality documentation, or looking to procure API‑certified drill pipe for your project?

Hebei Longway Petroleum Equipment Co., Ltd.

Obtain professional technical consulting 


Leave Message

Consult Our Engineers & Get Fast Official Quotation

Security verification
SUBMIT

Give you the best solution

  1. Inquiries get a response within 12 hours.
  2. We are a professional manufacturer with competitive pricing, and we accept all DEM/ODM orders.
  3. Our after-sales team provides 24/7 technical support; issues are addressed within 24 hours.
  4. Precision quality, on-time delivery, tailored service.

Recent Blogs